Description
Line Set for any tandem canopy. Specify canopy model, size, and line material. Typical production time is 10 days, dependent upon availability of line specs and materials.
Hybrid option combines a lighter weight cascade and upper control line. This reduces pack volume and drag, and it increases strength and durability by using a smaller insert into the main lines.
Reviews
There are no reviews yet.